DesignationCUSTOMERCountryYearBenefits
Transmission System of North Close (Entre Rios) ENERSAArgentina 2008Technical Evaluation Study and economical electricity supply in the province of Entre Rios, presentation to The IDB study loan management and EPRE within the technical procedures of access to transport capacity. Study of alternative system expansion for the period 2008-2022. Load Flow simulations. Computation of Power and Energy Non-supplied during the period of expansion, loss assessment. Executive Design approx. LAT 140 km of 132 kV and 2 EE.TT. 132/33/13, 2 kV. Bidding licitarios
Interconnection Recreation - La Rioja2 SA Minera TransportelArgentina 2007Basic design of 500 kV line. Studies Stage 1 and 2 within the framework of the Technical Procedures CAMMESA. Shunt Compensation Studies, Studies ATP, Zions temporary overvoltage and maneuver. Secondary arc neutralization. Insulation coordination.
Comprehensive Study of Supply
Electricity in the Province of s.cruz
Public Service Company of the StateArgentina 2005Technical-economic Study and Evaluation of Water supplies gas to the various localities of the province. Draft of facilities and pipelines. Works budget. Technical-economic assessment of alternatives abas-sufficiency (local generation and electricity transmission). Transmission Alternatives Study in 220/132 kV. Investment Cost Analysis, Cost and Energy Not Supplied losses during the period of expansion and several charge states. Flow simulations loads. Works budget. Calculation of evolution Node Factor.
Truncated Pico P.Madryn Interconnection 500 kVFederal Electricity CouncilArgentina 2004/05542 km transmission line and substations 500kV line basic design. Phase 1 studies within the framework of the Technical Procedures CAMMESA. Shunt Compensation Studies. Studies ATP. Temporary overvoltage and switching. Neutralization of arc. Coordination of insulation
Studies Access Capacity
25 MW Turbogas Transportation
SHELL CAPSAArgentina 2002/03Study load flows, short circuit and dynamic stability within the framework of Technical Procedures CAMMESA. Stages 1, 2 and 3. Testing Commissioning and performance RAT and RAV. Approval of models.
Interconnection P.Madryn Choele Choel 500 kVSIP-SADI Interconex Aluar.H.FutaleufúArgentina 2000/01354 km transmission line and substations 500kV line basic design. Gradients, corona losses, radio noise. Shunt Compensation Studies. Studies ATP. Temporary Overvoltages and ma-maneuver. Neutralization of arc. Coordination of insulation
HE central Snails and Black StoneAES CaracolesArgentina 2001Technical-economic assessment of alternative transmission at 220 and 132 kV. Investment Cost Analysis, Cost, Maintenance Cost and Energy Loss Provided no load flow simulations. Budget of the works. Calculation of evolution Node Factor.
Studies laCapacidad Transportation AccessSeveral agents MEMArgentina 2000/01Study load flows, short circuit and dynamic stability within the framework of the Technical Procedures of the Department of Energy. Stages 1, 2 and 3: Pluspetrol EyP. Tucumán 117 MW TG Stages 1 and 2 Puspetrol EyP. 47 MW TG Tucumán. Stage 2 AES. Paraná. 830 MW CC. Step 3.
Start Study in
Black 830 MW Combined Cycle
AES ParanaArgentina 2001Flow simulations prior volt dip for various schemes and boot sequences. Specification of technical characteristics of the boot drive.
TTRANSBA Transmission System. 500/132 / 66kVDistributors (FREBA) / Acronym SABs Aires Argentina2000 / ..."Study of system expansion alternatives for the period 2001-2006. Determination of investment plans every year. Load flow simulations. Analysis of reliability. Computing power and energy delivered during the period of expansion for successive contingencies N-1 and various loading conditions. Nodo.Cálculo Factor Calculation of Beneficiaries. "
Interconnection Argentina AES. Americas IncArgentina /
Brazil
1999 / ...System planning. Variants Study 500 kV, Brazil. Acronym SA 2700 MW AC 50 Hz 500 kV 50/60 Hz with Back to Back HVDC station. Electrical studies, load flow, short circuit and stability. Node Factor calculations. Calculate beneficiaries. Budget of the works. Recommendations.
Interconnection ArgentinaGeneratorsArgentina 1999Comahue-Gran Mendoza transmission and interconnection Chile. 500/220 kV Comahue Chile Reyunos (Arg)-High Jahuel (Chile) 500 MW. Electrical Studies. Cargas.Compensación flows shunt and series. Pérdidas.Selección voltage transmission. Basic design for crossing lines at altitudes of over 3000m. Gradients, corona losses, noise radioeleéctrico. Insulation design. Probab. discharge, back flashover. Path Selection. Computation and budgets.
Provincial Transmission System. 500/132 kVEdeersaEntre Rios Argentina1999Study of alternatives for system expansion period 2001-2012. Determination of plan investments every year. Simulations of load flow and short circuit. Computation of losses. -Analysis with reliability. Computing power and its energy-ministered during the suc-sive expansion for N-1 contingencies and various loading conditions. ATP simulations of the 500 kV system. Analysis: Surge and temporary power-res download. Neutralization secondary arc during reclose.
Closing of 500 kV in the SADIFederal Council of the Electric PowerArgentina 1998/99Feasibility study of the following closures 500kV Comahue-Gran Mendoza, NOA-Gran Mendoza, NOA-NEA, Mine Closures Miscellaneous, SADI-Patagonian System. Tasks by ESIN: Studies SADI expansion 2001-2010. Line parameters. Cargo flows. Shunt and Series Compensation. Calculate beneficiaries.
Combined cycle power plant 400 MW. Dock SudShell. CAPSAArgentina 1998Study of alternatives for the insertion of central network of GBA. Studies load flows and short circuits. Study of evolution of Node Factors for 2001-2006
Interconnection Argentina Brazil. 500 kVCEMSA / Acronym SAArgentina 1998Import capability study of energy from Brazil for the HVDC link designed for export of 2000 MW. Load flow studies and transient stability and dynamic. Determination of required investment in the Argentine system for successive levels of power import
Fourth Line Comahue-Buenos Aires. 500 kVGenerators ComahueArgentina 1997/991300 km transmission line and substations of 500kV. Work done in collaboration with ITP and other firms asociadas.Diseño Schenectady basic line. Gradients, corona loss, flow noise radioeléctrico.Estudios loads, and dynamic stability. Shunt compensation and serie.Estudios ATP. Temporary Overvoltages and ma-maneuver. Secundario.Interruptores arc neutralization. Preinserción.Inspección Resitores of force. Commissioning tests Revised draft lines and substations.
Interconnection Argentina AES. Americas IncArgentina /
Brazil
1996/98"Planning system. Studio Versions 500 kV, Brazil. 1500/3000 MW 500 kV AC 50 Hz 50/60 Hz with Back to Back HVDC station. Direct transmission HVDC + / - 400 kV. Electrical studies, load flow, short circuit and estabidad. Node Factor calculations. Calculate beneficiaries. budget works. Recommendations. "
Studies laCapacidad Transportation AccessSeveral agents MEM Argentina 1994/99 Load Flow Studies, short circuit and dynamic stability within the framework of the Technical Procedures of the Department of Energy. Stages 1,2 and 3. Examples: AES.Américas 830 MW Combined Cycle Genelba Paraná. 600 MW Combined Cycle. Genelba 2. 830 MW Combined Cycle fattened. 750 MW Combined Cycle Central Turbogas GECOR Villa Mercedes 2x40 MW. 240 MW Combined Cycle 130 MW Minera Alumbrera, line 220 kV 240 km .. Central Dam SA Industrias several: Corcemar, Eastman, etc. .. Fiplasto
HE central Snails and Black Stone - San JuanAES AmericasArgentina 1997Studies of connection to the transport system. Place of entrance and pre-dimensioning of links load flow simulations. Budget of the works. Calculation of evolution Node Factor. Turbogas supplementation.
Yacyretá Transmission System - 1500/3000 MW Ente binational Yacyretá Argentina / Paraguay 1996Study of transport capacity and reliability performed as a subcontractor of PTI. Modeling of the 500 kV system. Dynamics simulations for short, medium and long term. Extensive studies of stability. Feasibility of the extensions. Cost study.
Transmission System Supply Tierra del FuegoFLANGES / TOTAL Argentina 1995Transmission System Study. Selection of variants 750kV C, + /-600kVHVDC. 3000 MW. 2600km. Sizing of equipment and lines. Selection of conductors and economic vain. Electrical studies, load flow, short circuit and stability. Simulation HVDC.Presupuesto operation of the works. Recommendations.
Transmission System Comahue-Buenos Aires Generator Group ComahueArgentina 1994Study of alternatives to expand the 500 kV system. Comparison of EHV and HVDC solutions. 3000 MW. 1200 km. Search for alternative destinations for expansion. Extensive studies of dynamic simulation. Budget of the works. Determining boundaries of transport. PTI participated as a subcontractor.
Transmission System
Corpus KV 3000 MW500/735
Argentinean Paraguayan Joint Commission of the Parana River Argentina / Paraguay1993System planning. Variants Study 500, CHE -735 kV and + / -600 kV dc. Electrical studies of load flow, short circuit and stability. Cost study of 2800 km of lines. Creation of new substations and enlargement of the existing ten-ing. Analysis of the in-stubborn-connection with Brazil on Itaipu and Garabí.
Transener System 500/220 kVCartellone Endesa (CH)Argentina 1993Evaluation for privatization. Studies of transmission capacity. Deter-mine-tion of evolution factors and adaptation node. Analy-sis of losses. 'Study of need for replacement of equipment and machines. Analy-sis of cos-ments investment.
North Patagonian 500/330/132 kV systemAluarArgentina 1992System study to determine the feasi-bility of interconnection of Futaleufu with the national sys-tem at 500 kV. Car-ga flows, short-circuit, stability. Study-ing cos
Engineering Study for
urban distribution systems
Secretary of EnergyArgentina 1988/92Planning study, technology, organization, automation. Cost manual. Inventories. Management control. Rates and Customer Care Systems Segba, Deba, AyEE, EPEC, DPE DPE Mendoza and Santa Fe.
500 kV system Alicurá-SupplyHidronorArgentina 1981/88"Draft detail, management contracts (52 contracts provi-sions and works, Inspec-cio-tions in F-factory Inspection cio-tions in factories. Direction of Construction and Commissioning of a system as com- -to by 1700 km of 500kV lines and substation 7. "
Electrical System CHE-Sta La Leona. CrossWater and EnergyArgentina 1986/87Transmission system planning incorporating provincial Cen-tral HE 240 MW La Leona. 520 km 220 and 132kV lines and 4 substations.
Province of SaltaFederal Investment CouncilArgentina 1982/83Electricity planning in the province have-ta 2000.
Specification No. 82 in A and EEWater and EnergyArgentina 1981"Drafting" "General Technical Specification for Telecon-trolled Transformer Stations Network Interconnected Na-tional" "."
National Interconnected System Rep.ArgentinaWater and EnergyArgentina 1980Electrical studies of the systems 500, 220, 132 kV flows fillers, short circuit and stability. Selection of protection systems. Transient Studies in TNA. Surges. Neutralization secondary arc to ground.
Leveraging Multiple PotrerillosMendoza Min.OySPArgentina 1979Study factibi-bility of multiple use.
National System Rep.Ar-tinaSecretary of EnergyArgentina 1978/79Study of expansion of the Interconnected System of Argentina, per-iodine 1982-2000. Voltages 220, 500, 750 kV.
330 kV system and Futaleufu Pto.MadrynSade-SomerfinArgentina 1972/77Project details of system control, protection and remote Central rd-rich hydropower and 480 MW transmission system 330 kV, 1120 km of lines, four substation.
HE utilization Futa-Leufú-Pto.MadrynAluarArgentina 1976/77-Study with reliability for feeding the smelter. Recommendations on investments and operation.
Salto Grande 500 kV systemMain and AssocArgentina 1974Development of models of systems to study Argentine and Uruguayan of stability, coordination of TNA studies. Review reports.
Aluar Aluminum PlantAluarArgentina 1974/75ALUAR Interconnection - System Futaleufu. Detailed design of system control, monitoring and acquisition of datos.Diseño of sys-tems of rejection automatic load interlocks and control reagent.
CopyRight info@esin.com.ar | Webmaster KiWiK® - Soluciones Informáticas